Village and Town of Somers

Street Address
7511 – 12th Street
Kenosha, WI 53144

 

Mailing Address
P.O. Box 197
Somers, WI 53171

 

(262) 859-2822 Tel.
(262) 859-2331 Fax

 

Hours

8:00 am – 4:30 pm

Monday - Friday
 

Map Location

Wetland Delineation Contract Awarded for Somers 142 Sewer/Water Project

Printer-friendly versionPrinter-friendly version

 
On September 8, 2015, the Village Board of Trustees approved a $5,000 contract to Thompson & Associates for the purpose of wetland delineation services. This is one of the first steps needed to move forward with the Somers Highway 142/S Interceptor Sewer/Water Project that will provide sewer and water to the First Industrial development, and to future development in the area. The project site is located from 31st Street to the west side of the Canadian Pacific Railroad tracks, and a 2,400 foot corridor on Kenosha County Highway H.

 

Wetland delineation establishes the existence, location, and physical size of a wetland for the purpose of obtaining permits and complying with federal, state and local regulations.  For more information about wetland delineation, click here.  Thompson & Associates will stake the wetland boundaries and prepare a written report to the U.S. Army Corps of Engineers and the Wisconsin Department of Natural Resources.  Both Agencies will then review Thompson’s findings to determine whether sewer and water installation is eligible for standard trenching, or if directional boring is required.  Permits will be issued for either directional boring or standard trenching.  Directional boring can be up to three or four times the cost of standard trenching, and as a result, this process is an important step in estimating the project costs.
 

Share

Legal Notices – RFP’s

Neumiller Woods Water Quality Project
Date Due: March 23, 2017
Time Due: 2:00 PM

 

 

Proposal Form

 

Drawings

 

Printer Tips

To save paper, use the 'printer-friendly version' link on the top right of each page.